USES® XL SYSTEM INSTALL STEPS - TURNKEY

NGP (National Green Products) manages all USES® XL System installations from start to finish with certified commercial electricians who are experienced in installing this technology in commercial and industrial facilities.

Primary installation steps include:

  • Based on physical inspection and 24x7 facility electrical recordings determine optimal locations in facility to install USES® XL modules, including USES® XL module types and # per location and method of connection to existing electrical system for each location.
  • Complete an installation walk through of all install locations with customer’s facility manager and schedule a convenient day and time to connect the USES® XL System to facility electrical system.
  • Procure all necessary USES® XL products and electrical materials
  • Reconfirm final connection day and time with customer.
  • Connect all USES® XL Sub-panels and USES® XL Disconnect Switches to facility electrical distribution system.
  • Prepare As-Built Drawings (if necessary)

USES® XL modules provide 24x7 protection for facility electrical systems including main distribution gear and connected equipment loads as well as sensitive CNC machines, computers and communication equipment from harmful electrical conditions like current and voltage spikes, surges and lags, lighting strikes and other irregularities caused by utility providers and adjacent electricity consumers on the power grid.

The protection of capital investments like facility systems (infrstructure), production equipment, computers, main distribution gear and in some cases work-in-process and final product inventory can be priceless. The ROI payback for some installed USES® XL Systems has been immediate.