Installation Flexibility
XL SYSTEMS CAN BE INSTALLED IN SEVERAL WAYS
USES® XL Systems are installed and connected in parallel to existing facility electrical distribution systems in any of the following ways:
- Centrally on Main Distribution Panels (MDP) located at utility service entrance(s),
- Distributed on subpanels closer to equipment loads,
- Locally at equipment loads on the line side of controllers like Variable Speed Drives (VFD), Motor Control Centers (MCC),
- Directly on large inductive loads and
- any or all of the above.
Additionally,
- USES® XL Systems can be easily expanded at any time just by adding USES® XL modules.
- USES® XL Systems can be relocated at any time should a facility’s electrical conditions and/or operational loads change after initial installation.
- USES® XL Systems can be installed with very little to no interruption of facility operations.
- Approximately 95% of all installation work occurs while a facility is in operation.
- Some USES® XL Systems require that electric service be momentarily turned off at main breakers while final connections between USES® XL System locations and the facility electrical system are made.
(Click on any of the links below to see more USES® XL System installation information)
USES® XL Installation Main Page